El Marg WTP

Cairo, Egypt

Project Info

Client

Arab Contractors “Osman A. Osman and Co.” (ACC) 34 Adly Street, Cairo

Project Type

Turn Key Project FIDIC, Yellow Book, 1999

Completed

General Contractor

Arab Contractors “Osman A. Osman and Co.” (ACC)

Capacity

600.000 m3 / Day

Execution Time

36 month

Operation Time

12 month

Operation Time

12 month

Process

Water Treatment Plant

Details

Treated Water Plant , with Intake Pumping Station located at Ismailia Canal, coarse and fine screens, water-hammer protection and Diesel-Genset as Backup, Capacity 660.000m3/day. Two transmission Pipelines DN 1600, from Intake to the Plant each 9.800 meter length.
Plant with two Treatment Trains, with Flash-mixers, Reaction Chambers, Tube Settlers, Nozzle-less Rapid Sandfilters, Chlorination, Chemical Dosing, Reservoir, Treated Water Pumping Station, Surge and Water-hammer Protection, Back-up Diesel Genset, Sludge Thickening and Dewatering with Belt-Press.